| |
Machinery
Directive |
| |
Low Voltage Directive |
| |
Electromagnetic
Compatibility (EMC) Directive |
| |
We
have a proven track record in the CE marking of systems including: |
| |
The upgrading and Certification of existing systems. |
| |
The
Modification and Certification of new equipment, often imported
equipment not up to EU safety standards. |
| |
Projects
include: |
| |
The
Electrical upgrade and CE Marking of Power Presses to the Essential
Health and Safety Requirements (EHSR’s) of ANNEX IV of the
Machinery Directive (BS EN 692 and BS EN 693). This includes the
approval of a Notified Body. |
|
The Electrical Upgrade and Modification of Safety Systems of Machines imported to the UK. |
|
The Risk Assessment and Project Management of the installation of Complex Assemblies such as a production line. |